It's long and tedious work. But we're not paying somebody else to do it. Still, it's long and tedious work. I got the first third of the attic space taped and primed on Saturday. The taping was done on Friday, but I didn't start painting until Saturday morning.
I spent a little more than three hours doing the corners and baseboards with a brush then finishing the large surfaces with a roller. I was up and down from the scaffolding countless times. I moved the drop cloths around a lot. I still spilled paint on the floor. And I promptly cleaned it up.
The primer is very thick. I was complaining about it when Ken brought up a jug of water and said, "Thin it down!" That worked better. I think I'm going to put a second coat on with the roller just to be sure that it covers well. We still haven't picked a color for the room. And there are still two thirds to do. Taping. Corners. Baseboards. Rolling. I think Ken will help, so it should go a bit faster.
Then we have to paint it all.
I just did some rough calculations. The floor area of the space is about 65 square meters or about 700 square feet. The wall area (what we're priming and painting) is roughly 130 square meters, or about 1,400 square feet. Oh my.
Ocular mission accomplished
2 days ago